Ready to play
Ready to play
The article discusses the efforts of Blida Province to improve the water resources sector. The Minister of Water announced progress in addressing the water crisis by reducing leaks and improving water distribution. More distant points in the eastern area have been reached after activating seawater desalination pumps, currently providing 30,000 cubic meters of water that meet the needs. Additionally, the water treatment plant in Al-Afroun has been operated with a capacity of 8,600 cubic meters per day, and the SP1 pumping station for transporting desalinated water has been developed. Efforts have also been made to enhance storage capacities and pipelines to ensure fair and sustainable water distribution across the province.
Notice: This Is an AI-Generated Summary
Comments (0)