23 Hrs
Source:
النهار أونلاين
النهار أونلاين
Ready to play
Ready to play
A field visit was conducted by the Director of Highway Facilities Development following the detection of deformations and ground depressions on a section of the north-south highway in the Shua'a Al-Aar area. The purpose of the visit was to assess the technical condition and investigate the causes of the problem, with the aim of implementing suitable engineering solutions and correcting any irregularities to ensure the stability of the road and the safety of users. Additionally, the necessary measures were identified to guarantee the safe and efficient continuation of traffic flow.
Notice: This Is an AI-Generated Summary
Comments (0)