Ready to play
Ready to play
A report states that after the completion of the sewage network project in the Sadad area, the affected roads in Complex 1038 were leveled and paved using asphalt gravel as a temporary solution, to improve road conditions and facilitate the movement of residents and vehicles. A comprehensive project for the final paving is currently underway, alongside work on lighting and rainwater drainage, with the aim of enhancing infrastructure and providing integrated services in the area.
Notice: This Is an AI-Generated Summary
Comments (0)