بوابة أخبار اليوم
بوابة أخبار اليوم
Ready to play
Ready to play
Prime Minister Mostafa Madbouly attended the signing ceremony of a memorandum of understanding to establish Egypt's first wind turbine factory, aimed at producing components and equipment for local wind energy projects and exporting the surplus. The initiative includes a wind energy project with a capacity of 2,000 megawatts in the North Gulf of Suez area, as part of the state's strategy to achieve a 45% share of renewable energy in the energy mix within the next two years. The factory is expected to produce 2 gigawatts annually and to start operations within two years, promoting industrial localization in the energy sector and ensuring sustainability in the national grid.
Notice: This Is an AI-Generated Summary
Comments (0)