بوابة الفجر
بوابة الفجر
Ready to play
Ready to play
The Minister of Transport, Engineer Kamel El-Wazir, headed to oversee the implementation of the first phase of the high-speed electric train network, which connects Suez, El Alamein, and Matrouh, with a total length of 660 km and including 21 stations. He reviewed the finishing and preparatory stages of the stations and directed that the work be carried out with high quality around the clock, including the construction of pedestrian bridges and the connection of main roads to the stations. He emphasized that the project represents a qualitative leap in green mass transit, linking the Red Sea to the Mediterranean, and promoting economic development and environmental sustainability. The network includes three lines with a total length of 2,000 km.
Notice: This Is an AI-Generated Summary
Comments (0)