اليوم السابع
اليوم السابع
Ready to play
Ready to play
The National Development Plan aims to develop 1,120 level crossings on railway lines by 2030 to enhance safety and reduce the risks of accidents and collisions between trains, vehicles, and pedestrians. This is an increase from the 653 crossings that had been upgraded by 2022. The work goes beyond structural renovation of the crossings; it also involves rehabilitating the infrastructure and improving control and safety elements. This is part of a strategy to transform level crossings from traditional points into vital nodes within the transportation system, contributing to the preservation of lives and the improvement of operational efficiency on the railway network. This approach reflects the state's efforts to modernize the sector and strengthen its capacity to deliver safer and more effective services.
Notice: This Is an AI-Generated Summary
Comments (0)