بوابة الفجر
بوابة الفجر
Ready to play
Ready to play
The article focuses on the efforts of the Egyptian Ministry of Petroleum to accelerate the connection of the Harmattan Gas Field in the Mediterranean Sea to the production system, aiming to support domestic gas supplies. It was mentioned that the targeted production from the field is approximately 200 million cubic feet of gas per day and 4,400 barrels of condensates, with technical solutions being studied to shorten the implementation timeline. Additionally, the efforts of the Pharaonic Oil Company to increase production from other areas and develop drilling and exploration projects were reviewed, with an emphasis on the importance of applying the latest safety and environmental technologies to ensure the sustainability of operations.
Notice: This Is an AI-Generated Summary
Comments (0)