24 Hrs
Source:
اليوم السابع
اليوم السابع
Ready to play
Ready to play
The article focused on the efforts of the New Alamein City Authority in conducting field campaigns to identify illegal connections and violations on the drinking water and wastewater networks. This is part of the ongoing efforts to maintain the efficiency of the utility systems and ensure the legal use of water. The campaign resulted in the removal of an unlicensed water meter, the detection of tampering with a meter, and the repayment of debts totaling approximately 310,000 Egyptian pounds. Legal measures are ongoing, along with continuous monitoring of the networks to ensure the sustainability of services and infrastructure.
Notice: This Is an AI-Generated Summary
Comments (0)