بوابة أخبار اليوم
بوابة أخبار اليوم
Ready to play
Ready to play
The Minister of Water Resources and Irrigation, Dr. Hani Sweilam, has directed the development of underground drainage pipe factories to meet the needs of up to 80,000 feddans annually. This will be achieved by updating production lines and transitioning to the use of high-density polyethylene (HDPE) instead of polyvinyl chloride (PVC). The goal is to enhance efficiency and environmental sustainability, as HDPE increases the lifespan of pipes and doubles their productivity by up to 16%, while also improving their resistance to weather conditions and global fluctuations in raw material prices. Current work includes supplying and installing new production lines, developing quality control laboratories, with a focus on applying circular economy principles and reducing waste. The factory development is a vital strategy to ensure the fulfillment of the plan to replace and renew drainage pipes, supporting the protection of agricultural land, reducing costs, achieving environmental sustainability, and maintaining market stability amid price fluctuations.
Notice: This Is an AI-Generated Summary
Comments (0)