الموجز
الموجز
Ready to play
Ready to play
The Governor of Al Sharqiya, Engineer Hazem El Ashmouny, inaugurated the operation of the wastewater lifting station in Ezbet El Zend, Zaqazik Center. The project, costing 40 million Egyptian pounds, aims to serve more than 3,000 residents and improve the environment and public health. The project includes a lifting station with a capacity of 40 liters per second, along with drainage networks and a main outlet line measuring 6 and 3.75 kilometers respectively. Its goal is to provide safe and sustainable sanitation services in the village, in line with Egypt's Vision 2030. This initiative is part of a series of development projects aimed at enhancing infrastructure and achieving sustainable progress in the governorate.
Notice: This Is an AI-Generated Summary
Comments (0)