22 Hrs
Source:
بوابة الشروق
بوابة الشروق
Ready to play
Ready to play
The National Authority for Egyptian Railways has announced the operation of a single line at Bulaida Station in the Center of Al-Ayyat, Giza Governorate, to facilitate train movement on the Cairo-Aswan line in both directions, following a freight train collision that occurred in the same area. Measures have been taken to ensure the continuity of operations, and workers are continuing their efforts to fully restore regular services as soon as possible. Passengers are also apologized to for the delays caused by the accident.
Notice: This Is an AI-Generated Summary
Comments (0)