Ready to play
Ready to play
Water supply line replacement and renewal works will be carried out along Al-Ikhlas Street in Giza, starting from 12:00 PM on Friday, October 9, 2026, until the morning of October 10, 2026. This will result in a water outage in the areas of Arab Street and Al-Ikhlas Street, from Othman Mahram Street to Amr Bin Al-Aas Axis. The works aim to replace pipelines with diameters ranging from 100 mm to 400 mm to improve the water network. Pure water tankers will be provided to assist residents and affected facilities during the outage period, with operations expected to resume immediately afterward.
Notice: This Is an AI-Generated Summary
Comments (0)