بوابة الفجر
بوابة الفجر
Ready to play
Ready to play
The General Authority for Roads and Bridges has confirmed that the structural condition of the University Bridge over the Nile River is good and that the small crack that appeared in the sidewalk during the most recent safety inspection does not affect the integrity of the bridge. A comprehensive maintenance plan has been implemented to improve and restore the bridge’s efficiency, including repairs to parts that have corroded due to water accumulation around the rainwater drainage systems, all in compliance with quality and safety standards. The authority also indicated that the work is progressing according to the scheduled timeline, aiming to enhance safety and facilitate the movement of citizens.
Notice: This Is an AI-Generated Summary
Comments (0)