المصري اليوم
المصري اليوم
Ready to play
Ready to play
The Ministry of Transport has confirmed that the University Bridge over the Nile, which was inaugurated in 1957, is currently undergoing routine maintenance as part of a comprehensive plan aimed at enhancing safety and efficiency. They explained that the corrosion observed in small sections of the bridge piers resulted from repeated water accumulation around storm drain openings, and it does not compromise the structural safety of the bridge. Inspections were carried out by technical committees, and it was found that the overall structural condition is good. Maintenance work is being carried out by a specialized company to ensure the improvement of structural elements and safety. The work is progressing according to the scheduled timeline and high standards of quality.
Notice: This Is an AI-Generated Summary
Comments (0)