Ready to play
Ready to play
The General Authority for Passenger Transport in Alexandria announced a preparedness plan for the 2026/2027 winter season. The plan includes comprehensive maintenance of buses and insulation of vehicle roofs to prevent rainwater leakage, as well as the activation of a 24-hour emergency system and linking operations rooms to monitor the situation. Additionally, the plan covers the protection of the tram facility during floods and the provision of backup transportation means to assist with evacuation operations. The plan also involves reviewing operating routes after adverse weather conditions to ensure the safety of passengers and the continuity of services.
Notice: This Is an AI-Generated Summary
Comments (0)