1 Day
Source:
بوابة الفجر
Source: بوابة الفجر
1 Dayبوابة الفجر
Source: بوابة الفجر
1 DayReady to play
Ready to play
Assiut Governor Mohamed Alwan inspected work on a wall approximately 150 meters long along the Al-Wasita Canal in the village of Al-Wasita, in the Fath district. The project includes a concrete ground beam and a landscaped barrier to prevent waste from being dumped into the canal and protect residents from the dangers of getting too close to its banks. It will also improve the cleanliness and appearance of the village entrance. The governor stressed the need to meet technical specifications and safety standards and to speed up construction. He urged residents to help preserve the wall and the surrounding area.
Notice: This Is an AI-Generated Summary
Comments (0)