15 Hrs
Source:
بوابة الفجر
Source: بوابة الفجر
15 Hrsبوابة الفجر
Source: بوابة الفجر
15 HrsReady to play
Ready to play
The local unit of Abutig Center and City in Assiut carried out preparation and leveling works on the Dekran–Zarabi and Abu Kharas roads using grader equipment, under the supervision of the local unit in Zarabi village. The work included removing uneven sections and leveling both roads to make travel easier for residents and vehicles between the villages. Governor Mohamed Alwan affirmed that maintenance of internal roads and efforts to improve their condition would continue to be monitored.
Notice: This Is an AI-Generated Summary
Comments (0)