12 Hrs
Source:
بوابة الفجر
Source: بوابة الفجر
12 Hrsبوابة الفجر
Source: بوابة الفجر
12 HrsReady to play
Ready to play
Minya Governor Imad Kedwani followed up on the completion of construction work at Maghagha Central Hospital, ahead of its handover to the Ministry of Health and the completion of preparations for its operation. The hospital covers an area of 18,000 square metres and has eight floors, with a capacity of 318 beds. It includes Upper Egypt’s first burn unit, with 28 beds; 40 intensive care beds; and a dialysis unit equipped with 52 machines. Construction has been fully completed, with civil defence requirements met and services designed to be accessible to people with disabilities.
Notice: This Is an AI-Generated Summary
Comments (0)