كشكول
كشكول
Ready to play
Ready to play
Menoufia University President Ahmed Farag El-Kased followed up on the start of construction work for the expansion of the Oncology Institute on Tuesday, November 10, 2026. He met with the contractor to review the construction phases and timeline and to stress the importance of quality and safety. The building will cover an area of 3,500 square meters and rise nine floors. It is expected to add 480 beds, including 40 intensive-care beds and 40 intermediate-care beds, as well as six operating rooms for cancer surgery, 100 chemotherapy chairs, and four radiotherapy units. El-Kased said the project would support patient care in Menoufia and the Delta, strengthen medical education and research, and serve the institute, which has seven academic and medical departments.
Notice: This Is an AI-Generated Summary
Comments (0)