2 Days
Source:
بوابة الفجر
بوابة الفجر
Ready to play
Ready to play
Report on an inspection tour by the Egyptian Minister of Transport, Kamel El-Wazir, of the work sites at the stations and lines of the high-speed electric train network between Aswan and Luxor, covering a distance of 210 km. This is part of the high-speed train network project extending to 1,100 km and including 36 stations. The focus was on developing nine stations to meet the tourism, industrial, and agricultural needs, along with monitoring the implementation of works and adherence to the scheduled timelines. The goal is to improve connectivity between governorates, reduce travel time, and promote economic development in Upper Egypt.
Notice: This Is an AI-Generated Summary
Comments (0)