Ready to play
Ready to play
Electricity stations in Egypt have been supplied with an additional 600 million cubic feet of gas daily, bringing the total to approximately 4 billion cubic feet. This is aimed at meeting the gradual increase in loads, which has reached 37 megawatts due to rising temperatures. This effort is part of the government's initiatives to ensure the stability of the power grid during heatwaves, by enhancing technical readiness levels and continuously monitoring the stations' needs.
Notice: This Is an AI-Generated Summary
Comments (0)