وكالة موازين نيوز
وكالة موازين نيوز
Ready to play
Ready to play
The Ministry of Electricity confirmed the success of its plan for the Arbaeen pilgrimage of Imam Hussain (peace be upon him). All technical and engineering measures were implemented to ensure the stability of electricity supply during the pilgrimage days, despite the significant increase in loads. The plan included full mobilization of staff and resources, with the participation of more than 4,653 personnel, the use of 929 vehicles, the allocation of 108 buses for transporting pilgrims, and the operation of 36 mobile secondary substations. Additionally, the network was strengthened at the Karbala center and along the routes leading to it, with scheduled outages on these routes excluded from planned cuts. Operations rooms were activated to address outages, and power was secured for processions and hospitals to ensure continuous service throughout the pilgrimage. The plan concluded successfully thanks to the efforts of engineering and administrative teams, who ensured the sustainability of power supply to provide reliable service for millions of visitors.
Notice: This Is an AI-Generated Summary
Comments (0)