22 Hrs
Source:
وكالة الانباء العراقية (واع)
وكالة الانباء العراقية (واع)
Ready to play
Ready to play
The Anbar Province announced that the Al-Fallujah Large Water Project has been completed at a 91% progress rate. The project aims to provide approximately 50% of the city's drinking water needs. It contributes to improving water services and increasing the supply of water to neighborhoods and housing complexes, with an capacity of up to 4,000 cubic meters per hour. The project is expected to be operational within three to four months after addressing financial and technical challenges. It will play a significant role in strengthening the city's drinking water infrastructure and reducing the pressure on existing projects.
Notice: This Is an AI-Generated Summary
Comments (0)