الدستور
الدستور
Ready to play
Ready to play
Amman Municipality has announced a temporary full closure of the Station Bridge to traffic from dawn on Friday, July 17, until Saturday morning, July 18, in order to carry out maintenance work on the expansion joints to ensure safety and the sustainability of the infrastructure. Traffic will be rerouted so that vehicles coming from Amman towards Zarqa will pass underneath the bridge and then along King Abdullah Street and other projects, while those heading from Zarqa to the city center will take a designated alternative route. The municipality called on drivers to adhere to the instructions and guidance to ensure smooth traffic flow and the safety of all. The bridge will be reopened as soon as the maintenance work is completed.
Notice: This Is an AI-Generated Summary
Comments (0)