الوكيل الإخباري
الوكيل الإخباري
Ready to play
Ready to play
The Ministry of Public Works and Housing has begun executing the maintenance work to complete the repair of Al-Salam Street, which connects Irbid to the Ghor. This work started on Saturday as part of a plan to cover the entire vital road. The tasks include removing old asphalt mixes and applying new, improved layers made with polymer material. Additionally, safety measures such as installing road markings and signage are being implemented, along with improving the Northern Shouna Bridge by repairing joints and barriers. Coordination is ongoing with the Security Directorates to ensure smooth traffic flow through safe temporary detours. Drivers are also urged to adhere to traffic signals to maintain safety.
Notice: This Is an AI-Generated Summary
Comments (0)