Ready to play
Ready to play
The Ministry of Public Works and Housing has completed the modifications to the traffic flow at Prince Hussein Interchange on Queen Alia International Airport Road, aiming to reduce congestion and improve traffic smoothness. The adjustments include separating the lane designated for vehicles coming from Abdoun Corridor Tunnel in two directions: one allowing entry to the airport road and the other directing traffic directly towards Al Nakhil suburb and Al Sahabiyah neighborhood, without the need to pass through the airport road. The goal of these changes is to facilitate the movement of vehicles coming from the tunnel and Abdoun Corridor towards the suburbs, while inviting drivers to adhere to traffic signals to ensure safety and smooth flow.
Notice: This Is an AI-Generated Summary
Comments (0)