Ready to play
Ready to play
On Saturday morning, the Ministry of Public Works and Housing began maintenance work on a section of the Malki Road between Kerak and Tafilah, as part of a project that includes the repair of several main roads in the Southern Province. The works involve scraping and removing damaged asphalt layers, correcting subsidence, installing improved asphalt layers with polymers, as well as traffic safety measures such as painting lines, installing reflectors, and maintaining concrete elements and construction joints. The goal of the project is to enhance traffic efficiency, improve safety, and ensure the sustainability of the road network, in coordination with the Public Security, while adhering to safety guidelines and traffic directives to maintain smooth traffic flow and provide a safer road network.
Notice: This Is an AI-Generated Summary
Comments (0)