الوقائع الإخبارية
الوقائع الإخبارية
Ready to play
Ready to play
The Greater Amman Municipality has launched an urgent plan to strengthen the rainwater drainage network in the capital before the winter season. This includes the announcement of 8 new tenders aimed at improving the efficiency of drainage systems and constructing new lines in areas prone to water accumulation. The projects rely on precise technical studies to ensure thorough resolution of water pooling issues, and involve the construction of box culverts and collection tanks in vital areas such as Wadi Al-Sir, Khirbat Al-Souq, Marka Al-Hamam, and Al-Nahla District. The goal is to ensure smooth traffic flow during the upcoming rainy season. The municipality emphasizes that this strategy is part of a flexible emergency plan that is continuously monitored and adjusted based on site needs, ensuring the safety of citizens and vehicles. There is no fixed budget limit, and immediate readiness is maintained to intervene if hot spots appear during rainfall.
Notice: This Is an AI-Generated Summary
Comments (0)