Ready to play
Ready to play
Efforts have been focused on finding traffic solutions to reduce congestion in the northern and western areas of Amman, especially on King Abdullah II Street, as part of preparations for the Amman Bridge Project. The study proposed alternative routes extending from Dabuq towards Wadi Al-Seer, Al-Yadid, and the Airport Road, with the aim of decreasing travel delays that had increased from around 15 minutes to 30-35 minutes due to recent traffic jams. The proposals centered on widening roads, opening closed streets, improving traffic signals, and addressing bottleneck points, along with a plan for implementation that includes surveying, assessment, and exploring funding sources. It is expected that the proposed solutions will enhance traffic flow, increase the flexibility of the road network, and revitalize the Wadi Al-Seer area, with a joint technical committee to be formed for studying implementation, cost estimation, and scheduling.
Notice: This Is an AI-Generated Summary
Comments (0)