الوقائع الإخبارية
الوقائع الإخبارية
Ready to play
Ready to play
The Ministry of Public Works and Housing allocated approximately 23 million dinars to complete rainwater drainage projects during the past rainy season, which was described as exceptional. The ministry clarified that it had categorized locations where reports and observations were repeatedly received and conducted technical studies to find fundamental solutions. These included constructing box culverts, installing new pipes, and redirecting waterways. As part of the major projects, work was completed in Wadi Mabrouk in Aqaba, the Wida’ah culvert in Kerak, and the Zarka Ma'in Bridge over the Dead Sea. Most of the rainwater drainage projects have been finalized, supported by field teams equipped with 325 machinery.
Notice: This Is an AI-Generated Summary
Comments (0)