Ready to play
Ready to play
The plan to install 75% of the lighting units along Amman's Development Corridor using solar energy is an important step towards promoting clean and renewable energy solutions in infrastructure. The project's goal is to replace traditional lighting with smart, solar-powered systems to enhance public safety and reduce operational costs. The project spans approximately 42 kilometers and includes high-efficiency LED units and intelligent control systems to adjust light intensity and enable remote monitoring, which reduces theft risks and cuts electricity consumption. Having reached 75% completion, all units are expected to be installed within the next two weeks, positively impacting traffic safety, cost savings, and protection against vandalism of conventional lighting components.
Notice: This Is an AI-Generated Summary
Comments (0)