8 Hrs
Source:
وكالة عمون الاخبارية
Source: وكالة عمون الاخبارية
8 Hrsوكالة عمون الاخبارية
Source: وكالة عمون الاخبارية
8 HrsReady to play
Ready to play
The Ministry of Public Works confirmed that the temporary road on the Rameh–Joufeh route has culverts that allow floodwaters to flow through them or over the road’s surface. The road is closed when water levels rise and reopened once the water recedes and its safety has been confirmed. It serves residents while a new bridge is being built, after the old bridge was closed because cracks had worsened due to heavy rainfall. The ministry urged road users to follow the alternative routes.
Notice: This Is an AI-Generated Summary
Comments (0)