Ready to play
Ready to play
Excavation work carried out during construction in the Senn El Fil area caused significant damage to a 1200 mm water line supplying the Abu Haydar Tower tank, resulting in a water cut affecting multiple areas fed by the Dbayeh station and its connected neighborhoods, including Antelias, Jdaidat El Madina, Zahrour, and Dekaouineh. The Beirut and Mount Lebanon Water Authority announced that repair work on the line would begin immediately and would continue day and night without interruption, with water distribution to be restored once repairs are completed.
Notice: This Is an AI-Generated Summary
Comments (0)