15 Hrs
Source:
الكتائب اللبنانية
الكتائب اللبنانية
Ready to play
Ready to play
The Lebanese Ministry of Interior and Municipalities issued a joint decision outlining the procedures and requirements for installing solar panels with a capacity of less than 1.5 megawatts, aimed at regulating the installation process and enhancing public safety standards. The decision includes the necessary documentation and the oversight process for implementation. It is part of a plan to promote the safe and authorized use of solar energy in Lebanon.
Notice: This Is an AI-Generated Summary
Comments (0)