21 Hrs
التيار الوطني الحر
Source:

التيار الوطني الحر

2026-09-10T00:00:00.000Z

Most Read

Rizk Hospital recognizes Lebanon first responders

نداء الوطننداء الوطننداء الوطن
10 Hrs2026-09-10T10:47:36.000Z
Rizk Hospital recognizes Lebanon first responders

Al-Hashemi warns solar regulation may harm government

النشرةالنشرةالنشرة
12 Hrs2026-09-10T09:21:32.000Z
Al-Hashemi warns solar regulation may harm government

Fires in Khamis Mushait after Yemeni attack

قناة المنارقناة المنارقناة المنار
19 Hrs2026-09-10T02:12:36.000Z
Fires in Khamis Mushait after Yemeni attack

Occupation fire injures in Jabalya camp

قناة المنارقناة المنارقناة المنار
22 Hrs2026-09-09T23:00:08.000Z
Occupation fire injures in Jabalya camp

Izz ad-Din al-Qassam Brigades Mourn Leader

قناة المنارقناة المنارقناة المنار
22 Hrs2026-09-09T22:25:42.000Z
Izz ad-Din al-Qassam Brigades Mourn Leader
التيار الوطني الحر

Source: التيار الوطني الحر

21 Hrs
Jarayid.com
Follow Us
Jarayid.com

Smart Reader

Ready to play

Smart Reader

Ready to play

Interior Ministry Circular on Solar Panels

Interior Ministry Circular on Solar Panels

The Ministries of Interior and Municipalities, Public Works and Transport, and Energy and Water have issued a unified framework for the installation of solar panels with a capacity of less than 1.5 megawatts in Lebanon. This requires submitting an application to the local municipality or the Qaimmaqam (sub-governor), along with supporting technical and administrative documents, including certificates from licensed engineers and a map indicating installation sites and the stakeholders involved in approval. Technical conditions have been specified regarding the height of the panels, with a maximum of 3 meters on rooftops within buildings less than 15 meters high, and 4.5 meters on taller buildings. Installation above staircases is prohibited. The height of the panels on the ground must not exceed two meters, and their tilt must be suitable for sunlight exposure. The municipal authority or Qaimmaqam must decide on the application within 15 days. If there is no response after this period, the application is considered approved, and installation can proceed immediately upon payment of the fees. Engineers are required to submit a certificate of compliance after the installation is completed. Approval cannot be granted for properties that are suspended or non-compliant. It is emphasized that permits must be finalized within one year of notification of approval; otherwise, they will be considered invalid.

Size: 120%Text Size

Notice: This Is an AI-Generated Summary

Display The Full Article
Share the News

Comments (0)

JARAYID.COM

The Lebanon News page on Jarayid.com provides ongoing coverage of the latest news and developments across Lebanon, including politics, economy, sports, society, and local events. We summarize important Lebanese news and articles from trusted sources, helping readers quickly follow the latest developments, major stories, and topics affecting Lebanon and the Lebanese community.

Download App Free!

Scan the QR Code

QR code

Follow Us

OUR PICKS

World News thumbnail
World News

Liverpool beats Atlético at Anfield

Tech thumbnail
Tech

Apple's Key Announcements in 90 Seconds

Sports thumbnail
Sports

Liverpool starts Champions League with win

Categories

  • Podcast06
  • America652
  • Europe228
  • Health222
  • Shows74
  • Sports234
  • Tech340
  • World News439
  • Celebrity News153
  • Economy291
  • Terms & Conditions|
  • Privacy Policy|
  • About Us|
  • Contact Us|
  • Advertise With Us|
  • FAQ|
  • Archive

© 2026 Jarayid.com