103 Days
Source:
بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
The General Electricity Company announced the successful reactivation of the Arada line at 30 kilovolts in Tripoli, after carrying out emergency maintenance due to a technical fault. Alternative power sources were provided to ensure the continuity of the service during the repair period. Additionally, the teams carried out repairs on the damaged cable and re-energized the line in coordination with the Medium Voltage Department, as part of their efforts to maintain the stability of the electrical network.
Notice: This Is an AI-Generated Summary
Comments (0)