بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
Forty out of fifty wells in the Tazrabu field have been activated following the return of electricity in the area on Saturday afternoon. This came after a complete outage caused by a widespread blackout in the Eastern region, which led to the stoppage and deactivation of the wells. The wells are now being gradually restarted from the control room, in coordination with the relevant unit team, with ongoing efforts to bring the remaining wells online step by step. The authority clarified that the power outage was beyond their control and also resulted in reduced water supplies to some cities and agricultural projects, due to the loss of power in the well fields and the pumping station in Benghazi. This occurred amid a wave of total darkness across parts of Libya, caused by the failure of several main generation stations due to the disconnection of electrical lines, compounded by reports of decreased electrical capacity. As a result, residents are suffering more from power outages and water supply shortages.
Notice: This Is an AI-Generated Summary
Comments (0)