بوابة الوسط
بوابة الوسط
Ready to play
Ready to play
Al-Marg Power Plant in Egypt has begun procedures to clean and remove accumulated dust and residues from its equipment and insulators as part of its predictive and preventive maintenance plan. The goal is to enhance the reliability of the electrical grid and reduce faults caused by weather conditions. These measures follow the completion of the plant's safety securing procedures, and they involve technical teams working alongside national safety authorities to ensure a safe working environment. Additionally, the Ministry of Electricity and Renewable Energy announced that power has been restored to several areas in Benghazi after repairs to distribution cables. This aims to improve power stability and provide continuous services to citizens.
Notice: This Is an AI-Generated Summary
Comments (0)