1 Day
Source:
أخبار ليبيا 24
أخبار ليبيا 24
Ready to play
Ready to play
Benghazi is witnessing technical efforts to restart the River Cable 30 kV and to address fire damage at the Al-Majawarate 4 station, following an attack that caused it to go out of service. The goal is to restore electrical power and stabilize the electrical network in the area.
Notice: This Is an AI-Generated Summary
Comments (0)