Ready to play
Ready to play
The Ministry of Electricity and Renewable Energies in the government appointed by the House of Representatives announced damage to a power transformer station in Benghazi resulting from waste burning. The main causes are related to waste incineration, which led to damage to electrical equipment, posing a threat to the stability of power supply in the region. No further details were provided regarding the extent of the damages or corrective measures.
Notice: This Is an AI-Generated Summary
Comments (0)