عين ليبيا
Source: عين ليبيا
21 Hrsعين ليبيا
Source: عين ليبيا
21 HrsReady to play
Ready to play
The Prime Minister of the National Unity Government, Abdulhamid Dbeibeh, visited the Misrata dual power station, which has a production capacity of 1,300 megawatts. He monitored the emergency maintenance work on both the gas and steam units aimed at returning them to the national power grid. During the visit, he discussed the challenges facing the operation of the station and its needs to support maintenance and ensure safe operation. He directed the General Electricity Company to provide all necessary requirements and facilitate maintenance operations to ensure the stability of the electrical grid. This visit is part of his efforts to oversee the electricity sector and improve the performance of power generation plants in Libya.
Notice: This Is an AI-Generated Summary
Comments (0)