12 Hrs
Source:
أخبار ليبيا 24
أخبار ليبيا 24
Ready to play
Ready to play
The industrial river pipeline between Tarhuna and Abu Ziyan was subjected to sabotage, resulting in the loss of more than 80,000 cubic meters of water after a valve was opened at a high-pressure pumping station. Technical teams managed to respond to the incident and stop the leak, while investigations are still ongoing to identify the responsible party.
Notice: This Is an AI-Generated Summary
Comments (0)