1 Day
Source:
وكالة الأنباء الليبية
Source: وكالة الأنباء الليبية
1 Dayوكالة الأنباء الليبية
Source: وكالة الأنباء الليبية
1 DayReady to play
Ready to play
A partial closure of the main highway in Tripoli was announced on the morning of October 16, 2026, aimed at clearing and cleaning the drainage channels to improve water runoff and reduce flooding. The road will be closed in stages from Ghararat Bridge to Khadra Bridge starting at 8:00 a.m., with measures in place to facilitate alternative traffic flow via the service road in the Ghararat area. Traffic teams will be responsible for organizing traffic and guiding drivers, with an emphasis on caution and cooperation during the implementation period. The road will be reopened immediately after the completion of the works.
Notice: This Is an AI-Generated Summary
Comments (0)