Ready to play
Ready to play
The General Directorate of Road Transport announced the completion of topographical surveying work for the Tanf–Buseiri Road and the Saba Beiar connection, which extends for a length of 215 kilometers. The work was carried out in collaboration with Al-Mahandi Contracting and Roads Company of Qatar, using a 3D digital surveying device. The survey was completed within seven hours. The project includes road rehabilitation, addressing damaged sections, renewing the asphalt layer, and constructing a parallel lane to convert the road into a dual carriageway.
Notice: This Is an AI-Generated Summary
Comments (0)