12 Days
Source:
الشروق التونسية
الشروق التونسية
Ready to play
Ready to play
The train traffic along the coast has been partially disrupted between the South Sousse and Monastir stations due to the heatwave, which caused a power line to break and the use of only one track, leading to a partial stoppage. The National Tunisian Railway Company confirmed that train services between Monastir and Mahdia are continuing normally, and its technical teams are working to repair the fault to restore full operation on the line as soon as possible.
Notice: This Is an AI-Generated Summary
Comments (0)