24 Hrs
Source:
الجمهوريّة
الجمهوريّة
Ready to play
Ready to play
In Tunisia, from July 18 to July 24, 2026, there were over 18,294 intervention operations carried out by the technical teams of the Tunisian Electricity and Gas Company to restore electricity. This was a result of a severe heatwave that led to increased energy demand. The company was compelled to intentionally cut power to reduce loads and protect the grid, amid a severe climate crisis and rising electricity consumption. The teams worked around the clock to repair faults and ensure continuous supply to citizens and institutions, with officials expressing their understanding of the difficult situation.
Notice: This Is an AI-Generated Summary
Comments (0)