22 Hrs
Source:
الشروق التونسية
الشروق التونسية
Ready to play
Ready to play
The neighborhood of El Teweb El Mahreeri and the Rades area in the Rades municipality of Ben Arous will experience disruptions and water supply cuts tomorrow starting at 8:00 AM due to a sudden breakdown in the 400 mm diameter distribution pipe at Rades Beach. Repair work will continue throughout the day, with water supply gradually resuming beginning at 2:00 PM after the maintenance is completed. This intervention aims to repair the fault and ensure the normal resumption of water distribution once the work is finished.
Notice: This Is an AI-Generated Summary
Comments (0)