الشرق الأوسط
الشرق الأوسط
Ready to play
Ready to play
The Egyptian government anticipated the reactivation of the "Enrgyos Winter" Tgeyez Ship at the Damietta port during the last quarter of this year, following a fire caused by a drone attack at the end of July. This is considered an achievement in repairing a massive facility that handles natural gas. The Minister of Petroleum confirmed that the incident did not affect the market thanks to the strategic stockpile Egypt increased to 45 days, the diversification of gas supply sources, and a proactive plan that includes operating stations powered by mazut and diesel when necessary. During the ship's downtime, Egypt was able to meet its gas needs through other vessels, with a operations room monitoring consumption around the clock, thereby maintaining energy supply stability despite implementing precautionary measures in preparation for the winter season.
Notice: This Is an AI-Generated Summary
Comments (0)