أخبار الخليج
أخبار الخليج
Ready to play
Ready to play
The Bahraini Minister of Works, Engineer Ibrahim bin Hassan Al-Howaj, inaugurated the first phase of the North Isa City Intersection project. This phase involves constructing an elevated bridge with three lanes in each direction on Sheikh Salman Road, aimed at improving traffic flow and increasing capacity to over 22,000 vehicles per hour, representing a 77% increase compared to the pre-development capacity. The project seeks to enhance the efficiency of the road network, reduce congestion, especially during peak times, and provide better access to the surrounding areas. It also includes accompanying works such as rainwater drainage, sidewalks, and aesthetic improvements. It is expected to have a positive impact on the smoothness of traffic movement in the area.
Notice: This Is an AI-Generated Summary
Comments (0)