السويس بلدي
السويس بلدي
Ready to play
Ready to play
The Suez Canal Authority will temporarily suspend the Nasser Floating Bridge 1 starting at 1 a.m. tomorrow, Saturday, August 15, to carry out comprehensive maintenance work after ten years of operation. This is to ensure the issuance of new certification of suitability from the French supervisory authority BV (Bureau Veritas) and to preserve the safety of crossing travelers. Traffic will be redirected to Nasser Floating Bridge 2 and the harbor, with full operation of the ferry service to ensure traffic flow continues smoothly. The dismantling and relocation of the bridge to shipyards are expected to take no more than three months, after which it will be reassembled following the comprehensive maintenance work.
Notice: This Is an AI-Generated Summary
Comments (0)